RAD Data comm 100 Specifikace Strana 268

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 318
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 267
Chapter 7 Application Tutorial Installation and Operation Manual
7-24 IP DSLAM and WiMAX Backhauling over SDH/SONET Egate-100 Ver. 4.0
Figure
7-30. Locking the SFP Wire Latch
2. Carefully remove the dust covers from the SFP slot.
3. Insert the rear end of SFP into the socket, and push slowly backwards to
mate the connectors until the SFP clicks into place. If you feel resistance
before the connectors are fully mated, retract the SFP using the latch wire as
a pulling handle, and then repeat the procedure.
4. Remove the protective rubber caps from the SFP modules.
Connecting to Channelized T3 Equipment
The Egate-100 channelized T3 interface terminates in three pairs of
BNC connectors.
³ To connect the T3 interface:
Connect Egate-100 to the T3 equipment using BNC cables terminated with
BNC connectors.
CONTROL
Egate-100
RDY
ALM
12
LINK
MNG-ETH
LIN K
ACT
GbE
ACT
LINK
DCE
TX
RX
TX
RX
TX
RX
TX
RX
CH1 CH2 CH3
Figure
7-31. T3 BNC Connectors
Connecting to SDH/SONET Equipment
The Egate-100 SDH/SONET network port terminates in a fiber optic interface with
LC connectors (SDH/SONET).
³ To connect the SDH/SONET network equipment:
Connect Egate-100 to the SDH/SONET network equipment using a standard
fiber optic cable terminated with an LC connector. Refer to
Installing Fiber
Optic SFP Modules
for details on installing fiber optic SFPs.
Zobrazit stránku 267
1 2 ... 263 264 265 266 267 268 269 270 271 272 273 ... 317 318

Komentáře k této Příručce

Žádné komentáře