RAD Data comm Megaplex-2104 Specifikace Strana 20

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 32
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 19
Module Installation and Operation MP-2100 HS-R
Installation and Operation Manual
2-2 Preparation for Installation
2.2 Preparation for Installation
The HS-R modules have two jumpers that control the connection of the frame
ground to pin 1 in the channel connectors.
Default setting: pins connected to frame ground.
Figure 2-1 shows the location of the two jumpers for the HS-R. Note that the
modules include additional factory-set jumpers that must not be changed by the
user.
Jumper J3
NC
Frame Ground not
Connected to Pin 1
of CH.1-2 Connector
FGND
Frame Ground
Connected to Pin 1
of CH.1-2 Connector
Jumper J4
NC
Frame Ground not
Connected to Pin 1
of CH.3-4 Connector
FGND
Frame Ground
Connected to Pin 1
of CH.3-4 Connector
J1
FGND
J3
FGND SEL 1
NC
FGND
J4
FGND SEL 2
NC
Figure 2-1 HS-R Internal Settings
Module Installation
Refer to the system installation plan and insert the module in the assigned I/O slot
of the Megaplex enclosure. The module starts operating as soon as it is plugged
into an operating enclosure.
Zobrazit stránku 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 31 32

Komentáře k této Příručce

Žádné komentáře