RAD Data comm MBE10-8D Specifikace Strana 39

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 50
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 38
MBE Family Installation and Operation Manual Chapter 3 Operation
Operating Instructions 3-3
Power-on
To power-up MBE:
1. Set the POWER switch on the rear panel to the ON position.
The POWER indicator lights up, indicating that MBE is powered on. After
about 1 minute, the operational status screen appears on the terminal
screen.
2. Press the <Enter> key several times to display the password prompt.
Operating MBE
To operate MBE:
1. Configure MBE according to the application (see the LAN RANger Series
Configuration Guide).
2. During normal operation (when the remote workstations are active):
The READY indicator lights up continuously
The Tx and Rx indicators blink occasionally
The LAN and LINK error indicators remain OFF.
Power-off
To power-off MBE:
Set the POWER switch on the rear panel to the OFF position.
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com
Zobrazit stránku 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 49 50

Komentáře k této Příručce

Žádné komentáře